Assign a cost rate to organizational units

You can assign each organizational unit a cost rate that is included in measure calculation.

Prerequisite

You have the Organizational unit management function privilege.

Procedure. Procedure
  1. Click PPM > Administration.

  2. Administration opens on a separate tab.

  3. Click Organizational units in the Administration bar.

  4. Display the Base tab bar.

  5. Click Edit Edit.

    You can now edit organizational units.

  6. Select the organizational unit to which you want to assign a cost rate, or create a new organizational unit.

  7. Enter the cost rate for the organizational unit and select the cost rate unit. The cost rate is included in measure calculation.

  8. Click Save Save.

Your settings are saved in the PPM database.

If your system uses Autosave mode, the Save button is not available. In this case, your settings are automatically saved to the database.