Display goal accomplishment at functions

You can display the goal accomplishment of planned values graphically at functions in the EPC view.

Prerequisites

You have only set one function measure for your analysis.

The EPC is the aggregated EPC for several process instances. To do so, you must either be in the EPC view or select at least two process instances in the process instance table.

Planned value definitions exist for your current settings.

Procedure. Procedure
  1. Open an EPC view.

  2. Display the Base tab bar.

  3. Click button_properties Display options.

  4. Click EPC view settings.

  5. Enable the Display function measure option.

  6. Click OK.

  7. Display the Query tab bar.

  8. Click n_ppm_analyse_planwerte_einblenden Planned values.

An icon is shown at the functions, which visualizes the measure value of the function in relation to the planned values:

  • green: better than planned value 1

  • yellow: between planned value 1 and planned value 2

  • red: worse than planned value 2

You can select a function in the EPC view, the flow chart view, or in the function table. The selected function is highlighted when you change the view.